Projects
CURRENT PROJECTS
Valley Industrial Center
2646 W. Baseline Road
Rialto, CA
Acquired: Oct. 2018
Expected Completion: Oct. 2021
3.7 acre site that was acquired and subsequently entitled and is being developed into a 74,466 SF industrial facility.
Alder II Logistics Center
1336 Alder Avenue
Rialto, CA
Acquired: Jul. 2018
Expected Completion: Aug. 2021
4.5 acre site that was acquired and subsequently entitled and is being developed into a 78,680 SF industrial facility.
Interstate 210 Business Park
Casmalia Street
Rialto, CA
Acquired: Oct. 2019
Expected Completion: Nov. 2021
6.68 acre site that was acquired and subsequently entitled and is being developed into three manufacturing/distribution buildings totaling 76,800 SF.
Hilton Logistics Center
Hilton Drive
Fontana, CA
Acquired: Sept. 2020
Expected Completion: Nov. 2021
3.76 acre site that was acquired and subsequently entitled and is being developed into a 116,707 SF logistics center.
Rivard Business Park
Rivard Road
Moreno Valley, CA
Acquired: Jan. 2021
Expected Completion: Sept. 2022
2.28 acre site that was acquired and is subsequently being entitled and developed into two industrial buildings totaling 43,600 SF.
FUTURE PROJECTS
Allesandro Logistics Center
Allesandro Boulevard
Moreno Valley, CA
Expected Exit: Nov. 2021
17.16 acre site that will be entitled and developed into two industrial buildings totaling 375,000 SF.
PAST PROJECTS
Corporate Way Logistics Center
72234 Corporate Way
Thousand Palms, CA
Acquired: May 2015
Exit: Jul. 2016
Extensive renovation and refurbishment of existing 31,175 SF logistics building.
Slover I Logistics Center
15521 Slover Ave
Fontana, CA
Acquired: May 2015
Exit: Jul. 2019
8.7 acre industrial development that was acquired and subsequently entitled for the development of a 193,300 SF logistics building.
Steel Road Industrial Facility
1600 Steel Road
Colton, CA
Acquired: May 2016
Exit: Jul. 2017
Acquisition of entitled 4.1 acre site and development of a 59,600 SF industrial facility.
Alder Logistics Center
1450 North Alder Avenue
Rialto, CA
Acquired: Jul. 2017
Exit: Feb. 2019
6.7 acre site that was acquired and subsequently entitled and developed into a 120,756 SF logistics center.
Vineyard Industrial Facility
1850 W. Vineyard Ave
Rialto, CA
Acquired: Jul. 2017
Exit: Dec. 2020
5.8 acre site that was acquired and subsequently entitled and developed into a 119,014 SF industrial facility.
Baseline Logistics Center
2644 W. Baseline Ave
Rialto, CA
Acquired: Oct. 2017
Exit: Jan. 2021
4.6 acre site that was acquired and subsequently entitled and developed into a 99,999 SF industrial facility.